30 - 8. HORSE-POWER

Soeren Ekelund's electric-car construction works perfectly. But some parts made by various other companies have to be tougher. The cars have been subjected to extreme temperatures and brutal roads. The weak links in the chain have been mercilessly revealed. But the electric car construction are well designed, and that is why Soeren at any time has been able to figure out what was wrong, if we had a problem. Yesterday we had parked on the endless grassland with 0% power left. The generator was put to work, but went down all the time because Green Car took too much power. And when Hjalte adjusted the charger in the car it got too little power to start charging. We got an email through to Soeren and he replied at once with a trick to solve the problem, and now Green Car charges better than ever. We are ready for the Gobi desert!

Nina

Post new comment

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options

Mollom CAPTCHA (play audio CAPTCHA)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.